islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately …

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately …

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately …

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.

ENVIRONMENTAL PROTECTION ACT

The following are excerpts from the Environmental Protection Act 1.    “Contaminant” means any noise, heat, vibration or substance and includes such …

incinerators spacification

Specifications of ovens: Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the …